Create a New CSA Project: Difference between revisions

From OCAD 12 Wiki - English
Jump to navigation Jump to search
No edit summary
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[Category:Client Server Architecture]][[File:Ent40px.PNG|This function is only available in the OCAD 11 Enterprise Edition.|link=https://www.ocad.com/en/products/ocad-for-cartography]]
[[Category:Client Server Architecture]][[File:Ent40px.PNG|This function is only available in the OCAD Enterprise Edition.|link=https://www.ocad.com/en/products/ocad-for-cartography]]
==Connect to the Server==
==Connect to the Server==
After the '''[[Installation of the Client Server Architecture|Installation and Setup of the Client Server Architecture (CSA)]]''', a connection to the server can be made. Click the [[File:Icon_ConnectDisconnect.PNG]] '''Load and Manage Client Server Projects''' icon in the '''Client Server''' toolbar to build up a new connection. The '''Load and Manage Client Server Projects''' dialog is shown.
After the '''[[Installation of the Client Server Architecture|Installation and Setup of the Client Server Architecture (CSA)]]''', a connection to the server can be made. Click the [[File:Icon_ConnectDisconnect.PNG]] '''Load and Manage Client Server Projects''' icon in the '''Client Server''' toolbar to build up a new connection. The '''Load and Manage Client Server Projects''' dialog is shown.
Line 24: Line 24:
# Enter a project name in the '''Project Name''' field. In the '''Project ident''' field an identifier is automatically derived from the project name but can be manually adjusted, too.
# Enter a project name in the '''Project Name''' field. In the '''Project ident''' field an identifier is automatically derived from the project name but can be manually adjusted, too.
# Choose one '''Project type'' with the radio buttons
# Choose one '''Project type'' with the radio buttons
## '''Empty project''':Creates an empty OCAD 11 Enterprise project that has set up a real world offset and a coordinate system. Colors and Symbols are empty.
## '''Empty project''':Creates an empty OCAD 12 Enterprise project that has set up a real world offset and a coordinate system. Colors and Symbols are empty.
## '''Import project from existing file''':  With the mode “Import project from existing file” you can select an OCAD 11 file with an import the data. It is possible to choose what information of the file is loaded into the server project. Furthermore it is possible to choose another offset of the file to place multiple map files into an OCAD 11 Enterprise project.
## '''Import project from existing file''':  With the mode “Import project from existing file” you can select an OCAD 12 file with an import the data. It is possible to choose what information of the file is loaded into the server project. Furthermore it is possible to choose another offset of the file to place multiple map files into an OCAD 12 Enterprise project.
## '''Use existing project as base project''': This option let you choose an already existing project from the server and creates a new project on that. Symbols, Colors and settings are copied from the existing project to the new project. Objects are not copied but linked to the newly created project. The linked objects are shown in the background and cannot be changed in the inherited project. It is possible to change the styling of the objects by editing the symbol in the inherited project and also the status hidden of the symbol will hide both, the object in the new map project and the base map object
## '''Use existing project as base project''': This option let you choose an already existing project from the server and creates a new project on that. Symbols, Colors and settings are copied from the existing project to the new project. Objects are not copied but linked to the newly created project. The linked objects are shown in the background and cannot be changed in the inherited project. It is possible to change the styling of the objects by editing the symbol in the inherited project and also the status hidden of the symbol will hide both, the object in the new map project and the base map object


Line 33: Line 33:
# Click on ''Create'' creates the project an it is shown afterwards in the available projects list
# Click on ''Create'' creates the project an it is shown afterwards in the available projects list


'''Empty project''' creates an empty OCAD 11 Enterprise project that has set up a real world offset and a coordinate system. Colors and Symbols are empty.
'''Empty project''' creates an empty OCAD 12 Enterprise project that has set up a real world offset and a coordinate system. Colors and Symbols are empty.


===Create a project with '''Import project from existing file'''===
===Create a project with '''Import project from existing file'''===
Line 47: Line 47:
# Click on ''Create''
# Click on ''Create''


The '''Use existing project as base project''' option can be enabled if you want to use another CSA-Project as a template. The '''Map settings''' part of the dialog disappears and instead of that, you can choose a '''Base project''' from the dropdown list.
 


[[File:CreateNewProjectBaseProject.PNG]]
[[File:CreateNewProjectBaseProject.PNG]]


The new CSA-Project takes all map settings ('''[[Create a New Map#Set Scale and Coordinate System|Set Scale and Coordinate System]]'''), symbols and colors from the chosen project. They are copied once and are not updated if you change anything in the base project. In this case an update must be done manually.
 
 
The '''Use existing project as base project''' option lets you choose an already existing project from the server and creates a new project on that. Symbols, Colors and settings are copied from the existing project to the new project. Objects are not copied but linked to the newly created project. The linked objects are shown in the background and cannot be changed in the inherited project. It is possible to change the styling of the objects by editing the symbol in the inherited project and also the status hidden of the symbol will hide both, the object in the new map project and the base map object.
 
'''Important''': The creator of the project is the owner of the project. He is the only one possible to load the project after creation.
 
----


Next page: '''[[First Loading of CSA Project]]'''<br />
Next page: '''[[First Loading of CSA Project]]'''<br />
Back to the '''[[Client Server Architecture]]''' page.<br />
Back to the '''[[Client Server Architecture]]''' page.<br />
An overview about all pages dealing with the '''[[Client Server Architecture]]''' can be found in the corresponding category (see below for the link).
An overview about all pages dealing with the '''[[Client Server Architecture]]''' can be found in the corresponding category (see below for the link).

Latest revision as of 11:54, 29 May 2015

This function is only available in the OCAD Enterprise Edition.

Connect to the Server

After the Installation and Setup of the Client Server Architecture (CSA), a connection to the server can be made. Click the Icon ConnectDisconnect.PNG Load and Manage Client Server Projects icon in the Client Server toolbar to build up a new connection. The Load and Manage Client Server Projects dialog is shown.

The upper left side shows the connection data to the PostgreSQL server. It should be preconfigured by your administrator. The upper right side provides a login form in order to gain access to your projects. This login is personal for each user. Click the Connect button when you have entered all relevant data. If the login succeeds the table with all availaboe projects on the server is shown in the middle of the dialog. With the button Manage... in the Project user group box you are able to manage the project users if you have the right to. For further details read the article Manage project users

NewConnectionDialog.PNG

In the lower part of the Load and Manage Client Server Projects dialog there are several buttons and options:

  • Resync current open project after offline work: The Resync mode option allows to synchronize OCAD data back into the CSA-Project. Read the Resync a project after offline work article for more information.
  • Autoreload changes (5 seconds): With a checked Autoreload changes option, changes made by other users on the loaded CSA-Project are updated automatically every fifth second. The update happens in the background and does not become visible until the screen is refreshed.
  • Load selected project: Click this button to load the selected project. Projects can also be loaded by double click on the project name.
  • Clear selected project: Click this button to clear all entries made in the database on the server.
  • Delete selected project: Click this button to delete the selected projects completely (The whole database is deleted).
  • Create new project: Click this button to create a new CSA-Project.
  • Project information: Click this button to show all available information for the selected CSA-Project.

Create a New Project

To create a new CSA-Project, you must have the necessary Rights to do so. A server administrator can manage all the rights. More information can be found on the Rights Management page.

  1. Click the Create new project button. The Create New Project dialog appears.
    CreateNewProjectDialog.PNG
  2. Enter a project name in the Project Name field. In the Project ident field an identifier is automatically derived from the project name but can be manually adjusted, too.
  3. Choose one 'Project type with the radio buttons
    1. Empty project:Creates an empty OCAD 12 Enterprise project that has set up a real world offset and a coordinate system. Colors and Symbols are empty.
    2. Import project from existing file: With the mode “Import project from existing file” you can select an OCAD 12 file with an import the data. It is possible to choose what information of the file is loaded into the server project. Furthermore it is possible to choose another offset of the file to place multiple map files into an OCAD 12 Enterprise project.
    3. Use existing project as base project: This option let you choose an already existing project from the server and creates a new project on that. Symbols, Colors and settings are copied from the existing project to the new project. Objects are not copied but linked to the newly created project. The linked objects are shown in the background and cannot be changed in the inherited project. It is possible to change the styling of the objects by editing the symbol in the inherited project and also the status hidden of the symbol will hide both, the object in the new map project and the base map object

Create an Empty project

  1. Choose the Empty project in the creation dialog (dialog shown above)
  2. Adjust the Map settings (Set Scale and Coordinate System) as you are used to from local OCAD projects.
  3. Click on Create creates the project an it is shown afterwards in the available projects list

Empty project creates an empty OCAD 12 Enterprise project that has set up a real world offset and a coordinate system. Colors and Symbols are empty.

Create a project with Import project from existing file

  1. Choose the Import project from existing file in the creation dialog.
    CreateNewProjectDialogExisting.PNG
  2. Select with the check boxes what would you like to import into the project. Furthermore you can deselect the Import scale and offset parameter to shift the map if you want to.
    CreateNewProjectDialogExisting2.PNG
  3. Click on Create creates the project an it is shown afterwards in the available projects list. This will take a while, depending on your connection speed and objects to import.

Create a project with Use existing project as base project

  1. Choose the Use existing project as base project in the creation dialog
  2. Select a project you would like to derive from
  3. Click on Create


CreateNewProjectBaseProject.PNG


The Use existing project as base project option lets you choose an already existing project from the server and creates a new project on that. Symbols, Colors and settings are copied from the existing project to the new project. Objects are not copied but linked to the newly created project. The linked objects are shown in the background and cannot be changed in the inherited project. It is possible to change the styling of the objects by editing the symbol in the inherited project and also the status hidden of the symbol will hide both, the object in the new map project and the base map object.

Important: The creator of the project is the owner of the project. He is the only one possible to load the project after creation.


Next page: First Loading of CSA Project
Back to the Client Server Architecture page.
An overview about all pages dealing with the Client Server Architecture can be found in the corresponding category (see below for the link).